Knit-Along Pattern Wristful Thinking
photo on page 16, instructions on page 17
Updated: 14Dec2012
Corrections are underlined.
LEFT HAND
Body
Rows 1, 3, 5 and 7 (WS) K18, p2, [k2, p2] four times.
Rows 2 and 6 (RS) [K2, p2] four times, k2, p to end.
Row 4 K2, p2, [work smocking stitch, k1, p2, k2, p2] twice, p to end.
Row 8 [K2, p2] twice, work smocking stitch, k1, [p2, k2] twice, p to end.
Continue as written
Replace instructions for RIGHT HAND with the following:
RIGHT HAND
Cuff
Cast on 36 sts.
Rows 1-9 *P2, k2; rep from * to end.
Body
Rows 1, 3, 5 and 7 (WS) [P2, k2] four times, p2, k18.
Rows 2 and 6 (RS) P18, [k2, p2] four times, k2.
Row 4 P18, [work smocking st, k1, p2, k2, p2] twice, k2.
Row 8 P18, k2, p2, work smocking st, k1, [p2, k2] three times.
Rows 9–24 Rep rows 1–8 twice more.
Rows 25–28 *P2, k2; rep from * to end.
Bind off in rib.

Pattern #1 Scoop Neck Cable Pullover
photo on page 20, instructions on page 58
Updated: 23Apr2013
Correction is underlined.
1. FRONT
After working row 2 of the chart cont pats as set up and shape the front as the back until armhole measures 1 ¾ (2, 2 ½, 3, 3 ½)”/4.5 (5, 6.5, 7.5, 9)cm, end with a WS row.
2. Insert the following line before SHAPE NECK:
Cont to work cable pat in this way, work as for back until armhole measures 1¾ (2, 2½ , 3, 3½ )”/4.5 (5, 6.5, 7.5, 9)cm, end with a WS row.

Pattern #4 Aran Cardigan
photo on page 23, instructions on page 61
Updated: 07Dec2012
Correction is underlined.
GAUGE
25 sts and 28 rows to 4”/10cm over chart pattern, using size 7 (4.5mm) needles.

Pattern #15 Cabled Set
photo on page 32, instructions on page 71
Updated: 22Jan2013
Corrections are underlined.
Left Mitten
Once the WS set-up increases for the cable pat are complete and there are 58 sts on the needle.
Next (inc) row (RS) Work 44 sts in pats as established (including thumb gusset incs) 4-st LC, work to end—60 sts.
Continue to
Beg Chart
Next row (RS) Work 38 sts in pat (including thumb gusset incs), work chart row 7, cont as written.

Pattern #20 Hooded Cape
photo on page 39, instructions on page 73
Updated: 02Jan2013
Correction is underlined
Bobble row 2 (RS) With A, k5, with B, MB, *with A, k9, with B, MB; rep from * to last 6 sts, with A, k6.

Pattern #24 Bubble Vest
photo on page 43, instructions on page 77
Updated: 20Jun2013
Replace the first 2 rows of the short row neck on the left front as follows:
LEFT FRONT
Beg short row neck shaping
Next row (RS) Work to the last 3 sts, w&t, work to end.
Next row (RS) Work to the last 5 sts, w&t, work to end.

Patterns #27-29 Snowman Set
photo on page 48, instructions on page 81
Updated: 22Jan2013
The mittens should be cast on with color B.
